Seamlessly integrating a BOG compressor, we introduced new and upgraded piping to optimize efficiency. This comprehensive project included a study covering basic engineering, detailed engineering with ISOs, stress calculations, and support design.
Project — 2023
BOG Compressor integration Marine
Optimized BOG compressor integration with efficient piping design. Included detailed engineering, ISOs, stress calculations, and support design.
Our other marine projects
- Mer om Vessel thermal camera and 3D scann, onbaord Auto Eco, UECC
Vessel thermal camera and 3D scann, onbaord Auto Eco, UECC
We employed advanced technology, using both a thermal camera and 3D scanning, to meticulously mark specific areas and produce an accurate map of temperatures.
- Mer om HPR Valve refit, Enginnering and Design
HPR Valve refit, Enginnering and Design
Ramform Vanguard, we successfully executed a comprehensive refit. leveraging advanced technology to achieve precision in engineering and design.
- Mer om Upgrades and refits Golar LNG
Upgrades and refits Golar LNG
Embarking on various projects with Golar LNG involves a comprehensive process of upgrades and refits for different vessels worldwide.
- Mer om FSRU system for a client
FSRU system for a client
Generoc designed an FSRU system for a client, undertaking a comprehensive project that included a study comprising basic engineering, detailed engineering with ISOs, stress calculations, and support design.
- Mer om Detailed engineering, stress calculations, and support design.
Detailed engineering, stress calculations, and support design.
Generoc, in collaboration with Golar LNG, executed an upgrade of the Amine loop on the Golar Hilli LNG vessel.
- Mer om Engineering, piping, and 3D scan BWTS
Engineering, piping, and 3D scan BWTS
We conducted engineering for the installation of the Optimarin AS Ballast Water Treatment System (BWTS) on the RAMFORM EXPLORER PGS vessel.