Project

Engineering, piping, and 3D scan BWTS Marine

We conducted engineering for the installation of the Optimarin AS Ballast Water Treatment System (BWTS) on the RAMFORM EXPLORER PGS vessel.

Year: 2023

We performed precise engineering, piping, and a detailed 3D scan to install the Optimarin AS Ballast Water Treatment System (#BWTS) on the RAMFORM EXPLORER PGS vessel. Employing a strategic approach, our team meticulously designed and planned a comprehensive installation, ensuring a smooth re-classing process for the Ramform Explorer.

Our other marine projects

  • New valve designed in to our 3D scan, Enginnering and Design.

    HPR Valve refit, 3D Scan, Enginnering and Design.

    For PGS Apollo, we successfully executed a comprehensive 3D scan, leveraging advanced technology to achieve precision in engineering and design.

    Mer om HPR Valve refit, 3D Scan, Enginnering and Design.
  • Regas system

    BOG Compressor integration

    Optimized BOG compressor integration with efficient piping design. Included detailed engineering, ISOs, stress calculations, and support design.

    Mer om BOG Compressor integration
  • Upgrades and refits Golar LNG

    Embarking on various projects with Golar LNG involves a comprehensive process of upgrades and refits for different vessels worldwide.

    Mer om Upgrades and refits Golar LNG
  • Hoegh Gandria

    FSRU system for a client

    Generoc designed an FSRU system for a client, undertaking a comprehensive project that included a study comprising basic engineering, detailed engineering with ISOs, stress calculations, and support design.

    Mer om FSRU system for a client
  • Golar Hilli in Kribbi - Cameroon

    Detailed engineering, stress calculations, and support design.

    Generoc, in collaboration with Golar LNG, executed an upgrade of the Amine loop on the Golar Hilli LNG vessel.

    Mer om Detailed engineering, stress calculations, and support design.